Mirdad 4 — off-plan apartments in Motor City

Media: Union Properties / Mirdad marketing stills via Projects Scout and Property Finder
Price from
AED 763,000
Handover
December / Q4 2028 (target — dual portal + parent press)
Status
On sale
Construction
off-plan / under construction (portal timeline)
Developer
Union Properties
Area
Motor City

Mirdad 4 is a numbered tower on Union Properties’ Mirdad master plan in Motor City — four residential blocks around a shared podium next to the Autodrome district. Portals list this product as Mirdad 4 or Mirdad Four. [1] [3]

Today’s Property Finder and Projects Scout cards both open marketing near AED 763,000 for studios, sketch a 60% during construction / 40% on handover split, and aim delivery at December / Q4 2028. Propsearch files this building as a 14-storey tower inside a parent of about 1,087 homes across the four towers. [1] [2] [3] [4] [5] OffplanInsight writes for people shortlisting Dubai off-plan homes — not for Union Properties sales staff. Walk the brochure or showroom first, pick this tower if it fits, then make sure the paperwork already says Mirdad 4 (or the exact legal string) and the unit ID you chose. How we work: Method.

Who it’s for

People comparing a Motor City off-plan apartment who want Union Properties’ Mirdad framing, can work with the AED 763K open and 60/40 sketch, and will still check tower name, unit sizes and form labels before booking. [1] [5]

Who it’s not for

Buyers who need keys before the late-2028 public window [1]; households hunting a different Mirdad tower or a non-Mirdad Motor City product; anyone happy with a vague “Mirdad” form line instead of Mirdad 4 / Mirdad Four; shoppers blending Tower 4 with Tower 1–3 on the same shortlist card.

Key facts (public captures)

  • Builder — Union Properties P.J.S.C (high) [1] [5]
  • Portal product name — Mirdad 4 / Mirdad Four (high) [1] [3] [2]
  • Master plan — Mirdad at Motor City (high) [1] [4] [5]
  • Bedroom tabs — studio, 1BR, 2BR and 3BR apartments on the PF card (high product; sizes empty) [1] [5]
  • Buildings on this card1 tower among four Mirdad blocks (high) [1] [3]
  • Master marketing scale — about 1,087 homes across four towers + limited lofts (high — press + Propsearch; not Tower 4 alone) [5] [4]
  • Open price — from AED 763,000 (high — PF + Projects Scout + Propsearch parent launch) [1] [2] [4]
  • Tower size ladder — PF unit rows still “coming soon” for Mirdad 4 (low) [1]
  • Keys targetDecember 2028 / Q4 2028 / expected completion 1 December 2028 on PF (med) [1] [2]
  • Payment marketing60 / 40 construction / handover on PF, Projects Scout and Propsearch parent (high sketch — not SPA table) [1] [2] [4]
  • Title chip — freehold on PF (med) [1]
  • Height stamp — Propsearch 14 storeys for Mirdad Four (med — single source) [3]
  • Portal calendar — construction start 10 March 2026 on the Mirdad 4 card; parent ground-breaking press December 2025 (med) [1] [5]

Treat the bullets as filters for tower-by-tower shortlists. Cash, unit ID and handover wording only harden when they appear on the sale contract you sign.

Product shape

Judge the Mirdad 4 listing on its own merits — not the four-tower community brochure. Unveil copy still sells roughly 1,087 homes for the master plan; this page stays on the numbered tower. [5] [1]

What dual sources show for this tower:

  • Structured type = Apartment on PF key info; 1 building [1]
  • Unit tabs = studio, 1-bed, 2-bed and 3-bed in our capture; size cells empty [1]
  • Propsearch building guide = Mirdad Four, 14-storey, sibling to Mirdad One / Two / Three [3]
  • Projects Scout matches the open price, 60/40 sketch and December 2028 keys stamp [2]
  • Parent press describes four towers of varying heights (community max ~39 floors marketing) — not a locked Tower 4 height ladder [5] [4]

Open price near AED 763,000 is dual-locked as a marketing floor. For larger layouts, ask sales for a dated unit quote that already prints tower name, unit id and net area. [1] [2] Pool, gym, gardens and retail icons often sit on the master amenity list — ask which exhibits attach to your exact apartment. [1] [4]

Other labels that are not this card:

  • Parent Mirdad / Tower 1 marketing cards (own unit tables and construction stamps)
  • Mirdad 2 / Mirdad Two — sibling tower on Property Finder and Propsearch
  • Mirdad 3 / Mirdad Three — sibling tower on Propsearch
  • Mirdad One — sibling building label; sample DLD txs often show Mirdad 1

Keep Mirdad 4 on a separate shortlist row. Once you pick a tower, check that the booking form and sale contract already print that same tower name.

Keys timing and cash stages

Completion is the clearest public stamp for this tower. Property Finder shows delivery December 2028, Q4 2028 and expected completion 1 December 2028. [1] Projects Scout prints December 2028. [2] Propsearch and press aim the parent cluster at Q4 2028 as well. [4] [5] Those dates are brochure targets. Only the handover clause on the sale contract (or a later written notice from the seller) is binding.

Cash stages published for this product / parent (not a dual-locked SPA calendar):

  • Property Finder Mirdad 4: 60% during construction, 40% on handover [1]
  • Projects Scout Mirdad 4: same 60 / 40 framing [2]
  • Propsearch parent Mirdad guide: 60% construction, 40% handover [4]

Secondary channels sometimes float other Mirdad splits. Model only the sale-contract schedule. [1]

PF also stamps construction start 10 March 2026 on the tower card; parent ground-breaking coverage sits in December 2025. [1] [5] Plan multi-year draws if keys stay on a December 2028 window, plus a late-completion case.

Who builds it and where it sits

Developer hub: Union Properties. Public unveil and ground-breaking coverage name Union Properties for the Mirdad Motor City cluster; the company site is up.ae. [5] Copy the seller string from the reservation form and check it matches the sale contract before any fee leaves your account.

Area hub: Motor City. Property Finder nests the product Motor City → Mirdad → Mirdad 4. Propsearch files Mirdad Four under Mirdad / Motor City / DubaiLand, with sample transactions in Al Hebiah First. [1] [3] Brochure minutes to malls or airports are map orientation — not promised drive times.

Naming quirk: a parent “Mirdad” card and sibling tower cards share the brand. That is a path label, not a product swap. After you choose, make sure the paperwork already prints the tower you shortlisted. [4] [3]

Real risks and conflicts

  1. Tower mix-ups — Mirdad 4 is not a generic Mirdad apartment. Mirdad 1–3 and the parent card share the brand. [3] [4]
  2. Denominator errors — ~1,087 is master marketing; no dual-locked Tower 4 inventory was public at capture. [5] [4]
  3. Blank size rows — studio–3BR tabs without dual-locked built-up areas on the Mirdad 4 card. [1]
  4. Secondary payment noise — dual public cards show 60/40; other splits appear off-portal. Sale contract only. [1] [4]
  5. Keys are targets — December / Q4 2028 is widely marketed; dates can slip. [1] [5]
  6. Height is single-source — Propsearch’s 14 storeys for Four is not dual-locked with a second primary table. [3]
  7. Shared amenity claims — clubhouse, pool and retail may not be private to the tower. [1] [4]
  8. Seller-string drift — match reservation seller to SPA seller before any fee. [1]

Checklist before money moves

  1. Before money moves, confirm project registration and the named escrow account for this tower through Dubai Land Department tools.
  2. On the booking form and sale contract, check Mirdad 4 / Mirdad Four (or the exact legal tower string), unit id, bedroom type, net area and parking already match the home you shortlisted — not a vague “Mirdad” line. You read the developer’s form; you do not rewrite it. [1]
  3. Build your cash calendar only from the instalment table attached to your unit papers. Portal “60/40” is a filter, not a model. [1] [2]
  4. Compare the SPA handover clause with the marketed December / Q4 2028 stamp before cash moves. [1] [5]
  5. Ask for measured saleable area and plans for the exact studio or bedroom type — empty portal size rows are not measurements. [1]
  6. Ask the seller for written yearly service-charge guidance covering shared gardens, amenities and any commercial share.
  7. Read freehold / fee language inside the SPA — ownership chips on portals are marketing labels. [1]
  8. Keep brochure packs for Mirdad 1–3 in separate folders so tower labels cannot be mixed.
  9. Full process checklist: due diligence guide.

Bottom line

Bottom line: Mirdad 4 is Union Properties’ numbered fourth tower inside the Motor City Mirdad cluster — studio to three-bed apartments, open near AED 763,000, a dual 60/40 public sketch, and portal keys aimed at December / Q4 2028. [1] [2] [4] Hold it apart from Mirdad 1–3 and from the ~1,087-home parent total. Choose Mirdad 4 deliberately, then verify the printed form already carries that tower label. Independent research only — not developer disclosure.

FAQ

Who develops Mirdad 4?

Union Properties P.J.S.C is named on the Mirdad 4 portal cards and in official Motor City unveil coverage. Photograph the seller field on the booking pack and check it matches the sale-contract seller before you pay a fee. [1] [5]

Where does Mirdad 4 sit?

Inside Mirdad, within Motor City, Dubai. Property Finder nests it Motor City → Mirdad → Mirdad 4; Propsearch tags Mirdad Four under Mirdad / Motor City / DubaiLand. [1] [3]

What layouts are advertised?

Studio, one-, two- and three-bedroom apartments on the Mirdad 4 Property Finder card and in parent unveil materials. Measured sizes for Tower 4 were still blank on the PF unit table when we captured the page — ask for net-area sheets on the unit you shortlist. [1] [5]

How many homes are on public counts?

About 1,087 homes across four towers on official press and Propsearch for the parent Mirdad community. That total is not Tower 4 stock. We did not find a dual-locked unit count for Mirdad 4 alone. [5] [4]

What starting price should I trust?

Marketing open near AED 763,000 appears on Property Finder Mirdad 4, Projects Scout and Propsearch’s parent launch note. Larger bedroom quotes need a unit quote. Cash only settles on a dated unit price list or the sale contract. [1] [2] [4]

When do public cards aim for keys?

Property Finder and Projects Scout advertise December / Q4 2028 for Mirdad 4. Propsearch and press aim the parent cluster at Q4 2028 as well. Those stamps can move; trust the handover clause printed on the sale contract you sign. [1] [2] [4]

What instalment shape is published?

Property Finder, Projects Scout and Propsearch’s parent guide all report 60% during construction and 40% when keys are handed over. Rebuild every date from the instalment table attached to your unit papers. [1] [2] [4]

Is Mirdad 4 freehold?

Property Finder labels Mirdad 4 freehold. Ownership type only locks in the title / freehold clause of the sale contract. [1]

Sources

  1. Mirdad 4 by Union Properties P.J.S.C — Property Finder. Accessed 2026-08-09.
  2. Mirdad 4 by Union Properties PJSC — Projects Scout. Accessed 2026-08-09.
  3. Mirdad Four building guide — Propsearch. Accessed 2026-08-09.
  4. Mirdad multi-building complex guide — Propsearch. Accessed 2026-08-09.
  5. Mirdad Motor City unveil and ground-breaking coverage — Union Properties / Gulf News / Arabian Business. Accessed 2026-08-09.

Next step

Like it? See how it compares to similar projects, then ask the developer for the live price list and floor plans — everything here is marketing until they confirm it in writing.