Project file

Mirdad 3 — the tall off-plan tower in Motor City

Media: Union Properties / Mirdad marketing stills via Projects Scout and Property Finder
Price from
AED 763,000
Handover
December / Q4 2028 (target — dual portal + parent press)
Status
On sale
Construction
off-plan / under construction (portal timeline)
Developer
Union Properties
Area
Motor City

Stand in front of the labeled dusk render and the tall slim tower with the gold mid-belt is the one marked MIRDAD three. That is the product this page covers. Property Finder and Projects Scout sell it as Mirdad 3. Propsearch’s building guide calls the same block Mirdad Three and gives it 40 storeys — the high-rise of Union Properties’ four-tower Motor City plan, not the shorter Four. [1] [3]

Studio marketing still opens near AED 763,000. The public cash sketch is 60% while works run, 40% at keys, with handover aimed at December / Q4 2028. OffplanInsight is independent research for people shortlisting Dubai off-plan (pre-construction) homes — not Union Properties’ sales page. Walk the cluster. If this high-rise is the one you want, check the booking form and sale contract already name Mirdad 3 or Mirdad Three. How we work: Method. [1] [2] [4]

Who it’s for

Buyers who specifically want the tall Motor City Mirdad tower — the one the stills label Three — and can live with the AED 763K open, the 60/40 sketch and a late-2028 keys window, then still read the form before they book. [1] [3]

Who it’s not for

Anyone who needs keys before that late-2028 public window [1]; people shopping the short Mirdad 4 block, a Mirdad 1 or 2 unit, or another Motor City brand; anyone willing to sign a form that only says “Mirdad”.

Snapshot

  • Seller named on cards — Union Properties P.J.S.C (high) [1] [5]
  • How portals title it — Mirdad 3 (PF / Projects Scout) · Mirdad Three (Propsearch) (high) [1] [3] [2]
  • Where the tree puts it — Dubai → Motor City → Mirdad → Mirdad 3 (high) [1]
  • What this card is — one apartment tower inside a four-tower cluster (high) [1] [3]
  • Bedroom mix on the listing — studio plus 1 / 2 / 3 bed Type A rows; sq ft cells still empty (high mix / low size) [1]
  • Community headline stock — about 1,087 homes for all four towers, not this high-rise alone (high — press + Propsearch) [5] [4]
  • Marketing floorAED 763,000 studio open on PF, Projects Scout and the parent Propsearch launch note (high) [1] [2] [4]
  • Public cash sketch60 / 40 works / keys on those same three channels (high sketch) [1] [2] [4]
  • Advertised keysDec 2028 · Q4 2028 · PF expected 1 Dec 2028 (med) [1] [2]
  • Ownership chip — freehold on PF (med) [1]
  • How tall this block is — Propsearch 40 storeys for Three; press “max ~39 floors” is a community line (med — not dual) [3] [5]
  • Works stamp on this URL — PF construction start 9 March 2026; parent ground-breaking press Dec 2025 (med) [1] [5]

These are filters for the tall tower. Nothing here replaces the printed sale contract.

The high-rise with the mid-belt

The labeled still is the easiest way to keep the four names apart: Three is the slim high-rise with the gold waist. You are reading a page about that tower only. The 1,087 figure in unveil copy is the whole Motor City plan. [5] [3] [1]

Public cards agree on the shape, then go quiet on measurements:

  • PF key info: Apartment, 1 building, studio–3BR Type A. Size cells say coming soon. [1]
  • Propsearch: Mirdad Three, 40-storey, one of four siblings. [3]
  • Projects Scout: same AED 763,000 floor, same 60/40 sketch, same Dec 2028 keys chip. [2]
  • Press: four towers of mixed heights, community max about 39 floors — one floor off the Propsearch Three stamp, so we do not treat 40 as dual-locked. [5] [4]

A couple of PF FAQ sentences wander into lofts and duplexes. That reads like leftover parent copy. The structured table on this listing is still studio–3BR Type A with blank areas. [1]

Shared pool, gym, cinema and retail icons sit on the master amenity list. Ask which of those exhibits attach to the apartment you actually pick. [1] [4]

Other tickets, other folders:

  • Parent Mirdad — community card with its own size table
  • Mirdad 4 — the shorter labeled tower
  • Mirdad 2 / Two — sibling tower on Property Finder and Propsearch
  • Mirdad 1 / One — the name that shows up on most recent DLD samples

Pick the high-rise first. Then read the booking form and sale contract so they already print Mirdad 3 or Mirdad Three.

When keys are advertised, and how cash is sketched

For this URL the dates line up. Property Finder’s listing shows December 2028, a Q4 2028 handover chip, plus an expected-completion day of 1 December 2028. [1] Projects Scout’s completion chip is December 2028. [2] Propsearch plus official unveil copy aim the whole cluster at Q4 2028. [4] [5] Brochure calendars slip. The handover clause on the sale contract — or a later written seller notice — is what binds.

Public cash outline (a sketch, not your instalment table):

  • PF Mirdad 3: 60% during works, 40% at handover [1]
  • Projects Scout: the same 60 / 40 split [2]
  • Propsearch parent guide: 60% construction phase, 40% keys [4]

Secondary social posts sometimes advertise other splits. Rely on the sale-contract instalment schedule. [1]

This card’s construction-start chip is 9 March 2026. Parent ground-breaking press sits in December 2025. [1] [5] Budget the full draw if keys stay late 2028, and a late-keys case.

Motor City, four towers, one seller to check

Developer hub: Union Properties. Unveil coverage and the portal cards name Union Properties; the company site is up.ae. [5] Photograph the seller field on the reservation pack and check the sale contract carries the same string before any fee moves.

Area hub: Motor City. PF nests this listing Motor City → Mirdad → Mirdad 3. Propsearch files Mirdad Three under Mirdad / Motor City / DubaiLand, with sample sales in Al Hebiah First. [1] [3] Autodrome or mall “minutes” on the card are map orientation, not promised traffic.

Delete from your notes the PF masterplan paragraph that suddenly talks about Al Reem Island, a private marina and Abu Dhabi waterfront living. That block is a paste error on a Motor City page. [1]

The brand is shared. The tower name is not. After you choose, the printed form should already carry this high-rise. [4] [3]

What can go wrong on this shortlist

  1. You buy the wrong silhouette — Three is the slim 40-storey stamp, not a generic “Mirdad” apartment and not the shorter Four. [3]
  2. You treat 1,087 as this tower’s stock — that number is the four-tower unveil total. [5] [4]
  3. You model empty size cells — Type A rows have no dual-locked sq ft on this card. [1]
  4. You lock 40 floors as official — Propsearch only; press “max ~39” is community copy. [3] [5]
  5. You copy a social payment split — the dual public sketch is 60/40; other shapes live off-portal. [1] [4]
  6. You treat Dec / Q4 2028 as a promise — widely marketed, still a target. [1] [5]
  7. You brief from the Al Reem masterplan paste — that paragraph is not this plot. [1]
  8. You assume amenities are private to Three — most icons are shared cluster claims. [1] [4]
  9. You price off Mirdad 1 DLD samples — recent Propsearch txs mostly name Mirdad 1, some Mirdad 2, not Three. [4]
  10. The reservation seller and the sale-contract seller disagree — stop before the fee. [1]

What to check before a booking fee

  1. Confirm registration and the named escrow account for this high-rise in Dubai Land Department tools before money moves.
  2. Read the reservation pack and the sale contract. The printed tower should already be Mirdad 3 / Mirdad Three, with the unit id, bedroom type, net area and parking you chose — not a vague community line. You do not draft Union Properties’ form. [1]
  3. Build the cash calendar from the instalment table attached to your unit — not from the portal 60/40 chip. [1] [2]
  4. Put the SPA handover clause next to the marketed December / Q4 2028 stamp and note any gap. [1] [5]
  5. Ask for measured saleable area and plans for that exact Type A — blank portal rows are not a survey. [1]
  6. Ask sales for a dated service-charge note that includes gardens, shared leisure and any retail share.
  7. Read the freehold / fee clause inside the SPA. The PF ownership chip is a label. [1]
  8. Keep Mirdad 1, 2 and 4 packs in other folders so the tall-tower name cannot migrate.
  9. Strike the Al Reem / marina paragraph from any brief you send a lawyer. [1]
  10. Longer checklist: due diligence guide.

Bottom line

Bottom line: Mirdad 3 is the slim labeled high-rise in Union Properties’ Motor City cluster — studio to three-bed apartments, marketing open near AED 763,000, a dual 60/40 public sketch, portal keys aimed at December / Q4 2028, and a Propsearch 40-storey stamp that is not dual-locked. [1] [2] [3] Keep it off the shorter Four, off Mirdad 1–2 DLD samples, and off the 1,087-home parent total. Independent research — not official disclosure.

FAQ

Who is selling Mirdad 3?

Union Properties P.J.S.C is the name on the Mirdad 3 portal cards and on official Motor City unveil copy. Photograph the seller field on the booking pack and check the sale contract uses the same string before you pay a fee. [1] [5]

How do I tell this tower from the rest of Mirdad?

Marketing stills print MIRDAD three on the slim high-rise with the gold mid-belt. Propsearch files that block as a 40-storey building. The parent community card and the shorter Four are different products. PF’s tree is Motor City → Mirdad → Mirdad 3. Ignore the PF masterplan paragraph that jumps to Al Reem Island. [3] [1]

What can I actually buy in this tower?

The listing’s structured table is studio, one-bed, two-bed and three-bed Type A apartments. Square-footage cells were empty at capture. Request the measured sheet for the exact unit. A few FAQ sentences mention lofts; those look like leftover parent language. [1]

Is the 1,087-home figure this tower?

No. Official press and Propsearch use about 1,087 for the four-tower Mirdad community. We did not find a dual-locked count for Mirdad 3 alone. Recent Propsearch DLD samples mostly name Mirdad 1, not Three. [5] [4]

What price and payment sketch are public?

PF, Projects Scout and the parent Propsearch launch note all open studio marketing at AED 763,000. The repeated public sketch is 60% during construction and 40% at handover. Larger layouts need a dated unit quote. Model only the instalment table on your papers. [1] [2] [4]

When are keys advertised, and is it freehold?

December / Q4 2028 on Property Finder and Projects Scout, with PF’s expected-completion day 1 December 2028. Parent press uses the same quarter. Those are targets. PF also labels the listing freehold. Both the keys date and the title type lock only in the sale contract. [1] [2] [4]

Sources

  1. Mirdad 3 by Union Properties P.J.S.C · Property Finder. Accessed 2026-08-15.
  2. Mirdad 3 by Union Properties PJSC · Projects Scout. Accessed 2026-08-15.
  3. Mirdad Three building guide · Propsearch. Accessed 2026-08-15.
  4. Mirdad multi-building complex guide · Propsearch. Accessed 2026-08-15.
  5. Mirdad Motor City unveil and ground-breaking coverage · Union Properties / Gulf News / Arabian Business. Accessed 2026-08-15.

Next step

Like it? See how it compares to similar projects, then ask the developer for the live price list and floor plans — everything here is marketing until they confirm it in writing.