Kanyon by Beyond — off-plan sculptural tower in Dubai Maritime City
- Price from
- AED 2,400,000
- Handover
- Q2 2029 / June 2029 (official press + PF dual; developer target)
- Status
- On sale
- Construction
- off-plan / portal construction timeline July 2026 start
- Developer
- Beyond
- Area
- Dubai Maritime City
Kanyon by Beyond is a single Green Canyon high-rise that Beyond placed inside the Forest District of Dubai Maritime City. [1] [2] On the official product strip you get 412 residences, 1–3 bedroom plans, and a completion year of 2029. [1] The 25 Nov 2025 launch note sells the planted vertical spine, an AED 1.5 billion project headline, and keys aimed at Q2 2029. [2] On Property Finder the brochure floor is about AED 2.4 million with a 10/40/50 instalment headline. [3]
OffplanInsight writes independent buyer research — we are not Beyond’s sales desk. You are buying pre-construction stock, so cash leaves your account years before keys. If you like the tower with the green canyon façade, keep Kanyon off any form that only says “Maritime City Beyond”, and keep it away from Talea (Forest District sibling) or Soulever (Beyond’s twin towers nearby). How we work: Method.
Gallery
Images: Beyond Developments / Property Finder marketing stills
Snapshot
- Brand on the brochure — Beyond Developments; site copy also ties Beyond to Omniyat Group (med — legal seller is whatever the SPA prints) [1]
- Product string — Kanyon / Kanyon by Beyond (high) [1] [3]
- District — Forest District, Dubai Maritime City (official copy sits it beside Talea) (high) [1] [2]
- Form — one sculptural tower; PF key-info buildings = 1 (high) [1] [3]
- Inventory strip — product page 412 residences; launch note 411 (med — one-home drift) [1] [2]
- Bedroom range — 1–3BR apartments; canyon-style balconies in marketing (high) [1] [3]
- Open price filter — PF + Engel & Völkers from AED 2,400,000 (med — brochure floor; official page silent) [3] [4]
- Public keys stamp — Q2 / June 2029 (med — press + PF agree; SPA still wins) [2] [3]
- Payment headline — 10% / 40% / 50% (med — PF + E&V; no official PDF on capture) [3] [4]
- Ownership badge — freehold on PF (med — prove it on title papers) [3]
- Channel signal — PF sold-out badge with resale listings still visible on capture (med) [3]
Shortlist from dual-sourced rows first. Treat AED 2.4M as a brochure filter, not a promise of available stock. [3]
Product mix and sizes
Still photography shows one tall tower with a planted vertical “canyon,” warm metal fins, and a gold crown — the Green Canyon look Beyond uses for Kanyon. [1] [2] Official location copy puts the tower next to Talea inside Forest District, not on the Palm and not in Dubai Marina. [1]
Official strip: 412 residences. [1] Launch press (25 Nov 2025) writes 411 one- to three-bedroom homes. Prefer the product-page 412 until inventory paperwork settles the one-unit gap. [2]
Property Finder layout ladder on capture (portal cards, not a signed price list):
- 1 bedroom — roughly 798–928 sq ft; open from AED 2.4M [3]
- 2 bedroom — roughly 1,283–1,649 sq ft; open from AED 3.8M [3]
- 3 bedroom — roughly 2,266–2,402 sq ft; open from AED 7.5M [3]
Engel & Völkers repeats a close ladder (1-bed from 908 sq ft / AED 2.4M; 2-bed from 1,426 sq ft / AED 3.8M; 3-bed from 2,397 sq ft / AED 7.5M). [4] PF About prose also drops a 4-bedroom penthouse line, yet the unit tables only list 1–3 beds on capture — ask for a dated layout quote before treating penthouses as inventory. [3]
Pool, spa lounge, gym, kids’ zone and coworking hub appear in marketing decks. Those stay design intent until your drawings and handover schedule list them against the unit. [1] [3]
Payment and keys timing
Public keys stamp: official product year 2029. [1] Launch note: Q2 2029. [2] Property Finder: June 2029 / Q2 2029 (expected completion 1 June 2029). [3] Engel & Völkers: Q2 2029. [4] The window lines up across press and portals; the sale contract’s handover sentence is the only one that binds.
Public instalments: PF breaks the plan as 10% at sales launch, 40% across seven construction instalments, 50% at handover. [3] E&V repeats the same 10 / 40 / 50 headline. [4] Beyond’s product page capture had no public instalment PDF, so rebuild cash-flow from SPA dates rather than the dual portal filter.
PF’s timeline widget also shows construction start 1 July 2026 and expected booking 30 June 2026. [3] Those are calendar fields, not site audits. The AED 1.5 billion figure is a launch GDV claim — never a unit quote. [2]
Area and developer context
Developer hub: Beyond. Beyond hosts the Kanyon product page and presents itself under Omniyat Group on brand pages. [1] The party that signs your sale contract may be a special-purpose vehicle — match that line, not only the brochure logo.
Area hub: Dubai Maritime City. Forest District is the nature-led pocket where Beyond also places Talea; Kanyon is the Green Canyon tower next door in official copy. [1] Ask for parking bays, common-area rights and service-charge estimates in writing. Same waterfront district research on this site: Soulever by Beyond, Hilton Residences, Chelsea Residences 2, Oceanz by Danube. Wider Beyond graph on this site also covers SIØRA’s Hado and Palm West Crescent’s Passo Bella tower.
Fit: someone comparing Forest District towers who can hold a 10/40/50 cash-flow into 2029 and will only reserve once Kanyon and the unit number already appear on the form. [1] [3]
Risks buyers should price in
- 412 vs 411 — product strip and launch note disagree by one home. [1] [2]
- No official open price — AED 2.4M lives on PF and E&V, not on Beyond’s product capture. [3] [1]
- 10/40/50 lacks an official PDF on capture even though two portals agree. [3] [4]
- Sold-out badge + resale — primary vs assignment vs resale must be written, not assumed. [3]
- Name collisions — Talea (Forest District) and Soulever (other Beyond DMC product) can muddy a vague form. [1]
- Brand vs seller — Beyond / Omniyat Group marketing is not proof of the SPA contracting party. [1]
- Amenity brochure risk — lifestyle decks are not unit schedules until drawings say so. [1]
No rent forecasts and no “last units” theatre on this page.
Diligence checklist
- Open the reservation / sale pack and verify it already lists Kanyon by Beyond, the unit ID and the bedroom type you picked. Buyers check the form — they do not author Beyond’s template. [1]
- Confirm project registration and escrow through Dubai Land Department tools before any booking fee.
- Line up net saleable area, aspect and parking against the official layout set. [3]
- Build your payment calendar from SPA instalment dates only; treat 10/40/50 as a filter. [3]
- Put a date on every unit quote next to the ~AED 2.4M public open and PF sold samples. [3]
- Get written handover wording beside the Q2 / June 2029 public stamps. [2] [3]
- Ask whether the unit is primary, assignment or resale while PF still shows a sold-out badge. [3]
- Confirm freehold on title documents, not only the portal ownership field. [3]
- Run the same checks on one other DMC tower via our diligence guide.
Bottom line
Bottom line: Kanyon is Beyond’s Green Canyon tower in Dubai Maritime City’s Forest District, marketed with roughly 412 homes and 1–3 bedroom layouts. [1] [2] Portal open sits near AED 2.4M; Q2/June 2029 keys dual-lock with official press; 10/40/50 dual-locks PF with E&V but not with an official PDF. [3] [2] [4] Product page vs press still disagree by one home. Keep Kanyon, Talea and Soulever on separate mental shelves — pick the tower first, then check the booking form and sale contract name that same product. Confirm registration and escrow on DLD tools before money moves. OffplanInsight is independent research — not Beyond and not your sale contract.
FAQ
Who is behind Kanyon?
Beyond Developments markets the tower. Brand pages also mention Omniyat Group. Trust the legal seller printed on the sale contract, not the logo alone. [1]
Where is Kanyon?
Forest District inside Dubai Maritime City. Official product copy places it beside Talea. It is not Dubai Marina and not Palm Jumeirah. [1] [2]
What prices show in public sources?
PF and Engel & Völkers both open near AED 2.4 million for 1-beds, with higher “from” lines around AED 3.8M (2BR) and AED 7.5M (3BR) on capture. Beyond’s product page is silent on a starting price. Only a dated unit quote on the sale contract binds. [3] [4] [1]
When do keys arrive in public materials?
Product page year 2029; launch note Q2 2029; Property Finder June / Q2 2029. Contract handover language still controls. [1] [2] [3]
Sources
- Kanyon by Beyond — official product page — Beyond Developments. Accessed 2026-08-07.
- BEYOND Developments Unveils Kanyon, an AED 1.5 Billion Sculptural Tower Elevating Urban Living — Beyond Developments. Accessed 2026-08-07.
- Kanyon by Beyond — new project card — Property Finder. Accessed 2026-08-07.
- Kanyon by Beyond Dubai Maritime City — Engel & Völkers. Accessed 2026-08-07.
Next step
Like it? See how it compares to similar projects, then ask the developer for the live price list and floor plans — everything here is marketing until they confirm it in writing.
