Sea Cliff by Imtiaz — off-plan on Dubai Islands

Media: Imtiaz Developments marketing stills
Price from
AED 1,995,000
Handover
Q1 2028 public target (official + press); portal August / Q3 2028 conflict
Status
On sale
Construction
early construction (developer progress + portal timeline)
Developer
Imtiaz Developments
Area
Dubai Islands

Sea Cliff by Imtiaz sits on the water at Dubai Islands. The official product title uses two words; Property Finder’s card usually prints Seacliff. Either way you are looking at one coastal apartment product: marketed 1–4 bedroom homes with sea-view stills, plus press language for exclusive four-bedroom duplex layouts. [1] [2] [4]

The numbers buyers argue about are public and mixed. Portal open sits near AED 2 million (FAQ 1,995,000). Cash stamps land 50% on handover — PF shows 20 / 30 / 50, official meta says 50 / 50. Keys still disagree: Imtiaz and groundbreaking press aim at Q1 2028; Property Finder stamps August / Q3 2028. [1] [2] [4] This page is independent buyer research on OffplanInsight, not a brochure. Only the sale contract locks net price, unit id and keys date. How we work: Method.

Who it’s for

Buyers comparing a multi-storey waterfront apartment product on Dubai Islands who can fund instalments into a 2028 keys window and care more about sea-view living than needing a dual-locked public size ladder on day one. [1] [4]

Who it’s not for

Anyone who must receive keys before the portal August / Q3 2028 stamp (or the earlier official Q1 2028 target if that is what their SPA actually says), who needs a dual-locked public unit count before shortlisting, or who was shown Beach Walk / Cove / Sunset Bay when the form should say Sea Cliff by Imtiaz. [4] [1]

Snapshot for shortlisting Sea Cliff

  • Public name — Sea Cliff by Imtiaz; portal also Seacliff (high) [1] [4]
  • Developer — Imtiaz Developments (high) [1] [4]
  • Place — Dubai Islands waterfront (high) [1] [4]
  • Homes marketed1–4 bedroom apartments; press adds exclusive 4BR duplex homes (high) [1] [2] [4]
  • Buildingsone on the PF card (high) [4]
  • Portal starting price — launch about AED 2M / FAQ AED 1,995,000 (med — PF) [4]
  • Broker reference — Engel & Völkers from AED 1.99M for 1BR (med — not dual-locked) [5]
  • Payment labels — PF 20 / 30 / 50; official meta 50 / 50 (both end with 50% on handover) (med) [4] [1]
  • Keys window — official + press Q1 2028 vs PF August / Q3 2028 (med — conflict) [1] [2] [4]
  • Title chip — freehold on PF; still verify on title documents (med) [4]
  • Progress widget — about 6% overall (sub-structure 35%) on imtiaz.ae (med — developer self-report) [1]
  • Press project value — about Dh600 million at groundbreaking (med — press) [2] [3]

Use this block to decide whether Sea Cliff belongs on a shortlist. Confirm registration and escrow via Dubai Land Department tools before any deposit. [6]

What you are buying

Think one waterfront apartment block on Dubai Islands, not a villa cluster. Imtiaz shows open decks, sea views and resort-style amenity stills; groundbreaking press also names Hermès, Villeroy & Boch and Miele for interiors — treat brand finishes as marketing until your brochure exhibits and handover pack list them for the unit. [1] [2]

What public materials agree on vs what stays thin:

  • Types1–4 bedroom apartments on the official title and PF about-block (high) [1] [4]
  • Duplex row — exclusive 4BR duplex language on groundbreaking press (high — press) [2]
  • Portal starting price — about AED 2M / FAQ 1,995,000 (med) [4]
  • Size bands — Engel & Völkers only: 1BR ~800–1,100 sqft; 2BR 1,200–1,800; 3BR 1,900–2,500; 4BR 2,800–3,500 (low — single broker, not dual-locked) [5]

No dual-locked residential unit count and no official storey count appear on the captures we used. Amenity chips (sea-facing / infinity pool, outdoor gym, yoga, outdoor cinema, pavilion clubhouse, kids pool and play, BBQ and fire-pit seating) stay brochure claims until SPA exhibits name them. [1] [2]

Do not confuse Sea Cliff with Beach Walk, Cove, Sunset Bay or Wynwood — each has its own Imtiaz product page and paperwork trail. [1]

Cash schedule and keys

Keys — two calendars still fight:

  • imtiaz.ae estimated completion Q1 2028 [1]
  • Groundbreaking press + Gulf News partner mirror: handover in the first quarter of 2028 [2] [3]
  • Property Finder: delivery August 2028 / Q3 2028, expected completion 15 August 2028 [4]

If you need a conservative planning date, use the later portal stamp until your sale contract prints a different keys clause.

Payment labels:

  • Property Finder: 20% at sales launch, 30% during construction, 50% on handover [4]
  • Official meta: flexible 50 / 50 plan [1]

Both labels still finish with 50% on handover. [4] [1] Intermediate instalment dates only lock on the calendar attached to your unit.

PF also prints booking 15 February 2026 and construction start 16 February 2026. Formal groundbreaking press is dated 30 June 2026. [4] [3] Read those as public phase labels, not a site visit report.

Who builds it and where it sits

Builder hub: Imtiaz Developments. [1] On the booking form, check the legal seller string matches the sale contract — the public brand name alone is not enough.

Map hub: Dubai Islands. Official copy places Sea Cliff on a waterfront island pin with bridge and road links toward the mainland; orientation lines mention DXB, Downtown and Dubai Creek as reachability cues, not stopwatch commute guarantees. [1] [4]

Other Imtiaz work already researched here sits inland or on different corridors — design-led towers such as The Symphony in Meydan Horizon, the Downtown Jebel Ali Raw District series, and Dubai South’s Enre Residence. [1] On the islands themselves, compare only after you open each product’s own page: Avenew’s Cheval Residences, Ellington’s Meriva cluster, and Beyond’s Hado / Shione stack are different sellers and cash tables. Longer buyer checklist: off-plan diligence guide.

Real risks on this shortlist

  1. Keys conflict — official/press Q1 2028 versus PF August / Q3 2028. Build your personal timeline on the later stamp unless the SPA says otherwise. [1] [4]
  2. Payment wording differs — meta 50 / 50 versus PF 20 / 30 / 50. Both land 50% on handover; only the printed instalment calendar is binding. [1] [4]
  3. “From” price is a filter — portal ~AED 2M is not a full price list. [4]
  4. Sizes thin — Engel & Völkers bands are single-source; official and PF tables did not publish a matching public ladder at capture. [5]
  5. No dual-locked home count — do not infer sell-out pressure from renders.
  6. Amenity and brand-interior claims — Hermès / Villeroy & Boch / Miele and lifestyle chips stay marketing until drawings and the handover pack lock them. [2]
  7. Sibling mix-up — Beach Walk, Cove, Sunset Bay and other Imtiaz island products are different rows. [1]
  8. Early works — developer progress near 6% at capture; multi-year runway remains. [1]

This page does not forecast yield, rank products or invent scarcity.

Before any booking money leaves

  1. Decide you want Sea Cliff by Imtiaz (not Beach Walk, Cove or another island tower). Then check the booking form and sale contract already name that product, the unit ID and the bedroom type. You do not author the developer’s contract. [1]
  2. Pull the DLD registration and escrow status for this product string before any deposit. [6]
  3. Compare the seller field on the reservation pack with the seller field on the sale contract. [1]
  4. Request the instalment calendar that names Sea Cliff. Rebuild cash from those dates — not the PF 20/30/50 chip or the meta 50/50 line alone. [4] [1]
  5. Attach price to one unit plan and one net/sellable area figure from the developer pack.
  6. Keep the written keys wording for that unit. Official Q1 2028 and portal August 2028 still conflict. [1] [4]
  7. Get in writing: common vs in-unit amenities, what any “duplex with private pool” marketing includes for your stack, and post-handover service-charge scope. [1] [2]
  8. For a longer pre-money checklist, open our diligence guide. Sea Cliff content here is research, not Imtiaz sales copy.

Bottom line

Bottom line: Sea Cliff is Imtiaz’s coastal apartment product on Dubai Islands — 1–4BR marketing, portal open near AED 2M, cash tables that land 50% on handover (20/30/50 or 50/50 framing), and a real keys conflict between official Q1 2028 and portal August/Q3 2028. [1] [4] Name, place and developer dual-lock; sizes and unit count do not. Close only after the form names the product, unit and cash table you chose.

FAQ

Who develops Sea Cliff?

Imtiaz Developments publishes Sea Cliff by Imtiaz on Dubai Islands. Before money moves, make sure the reservation pack and the sale contract both list the same legal seller. [1] [4]

Is Seacliff the same product as Sea Cliff?

For shortlisting, yes. Official title is Sea Cliff by Imtiaz; Property Finder’s card uses Seacliff / Seacliff by Imtiaz. Still keep it separate from other Imtiaz island towers. [1] [4]

What is the starting price?

Property Finder shows launch about AED 2 million and FAQ starting price AED 1,995,000. Engel & Völkers lists about AED 1.99M for a 1-bedroom. The official product page did not print a fixed public ladder at capture. Treat “from” as a shortlist filter until a dated unit quote is in hand. [4] [5]

What payment plan applies?

Property Finder lists 20% at sales launch, 30% during construction and 50% on handover. Official marketing meta describes a flexible 50/50 plan. Both land 50% on handover with different step labels. The binding cash table is the one printed for your unit. [4] [1]

When should keys arrive?

Imtiaz’s product page and groundbreaking press target Q1 2028. Property Finder targets August / Q3 2028, with expected completion 15 August 2028. Ask for the keys wording on your own sale contract. [1] [2] [4]

What unit types are offered?

Official and portal materials market 1–4 bedroom apartments. Groundbreaking press adds exclusive four-bedroom duplex homes. Public unit count and dual-locked size ladders were not available on our captures — confirm on plans. [1] [2] [4]

Sources

  1. Sea Cliff by Imtiaz — official product page — Imtiaz Developments. Accessed 2026-08-09.
  2. Groundbreaking of Dh600 million Sea Cliff Residence — Imtiaz Developments. Accessed 2026-08-09.
  3. Imtiaz expands Dubai Islands portfolio with Dh600m Sea Cliff Residence — Gulf News. Accessed 2026-08-09.
  4. Seacliff — Imtiaz Developments new-projects card — Property Finder. Accessed 2026-08-09.
  5. Sea Cliff by Imtiaz off-plan page — Engel & Völkers. Accessed 2026-08-09.
  6. Dubai Land Department public status / registration tools — Dubai Land Department. Accessed 2026-08-09.

Next step

Like it? See how it compares to similar projects, then ask the developer for the live price list and floor plans — everything here is marketing until they confirm it in writing.